Project ContentProject settlement and monitoring for a PV-solar system (250 kW), pre-test, elimination of operational problemsExpirationWe first considered the design of the plant with the help of all the documents. We especially paid attention to the substructure, the electrical design and the choice of the PV modules. Furthermore the quality of the execution was assessed within an inspection of the plant. Based on this, we prepared a final report, which included a risk assessment as well as a list of potential improvements. ResultsWe found technical errors in the plant and documented them in our report. The mistakes were eliminated by the company, which was responsible for the construction of the solar system. The costs were approximately 20% of the initially project investment. ImplementationThe plant was successfully taken into operation in 2010. |