Solar system

Project settlement
A private investor
<1 Mio. €
Germany
Project settlement , PV-solar system, pre-test

Project Content

Project settlement and monitoring for a PV-solar system (250 kW), pre-test, elimination of operational problems

Expiration

We first considered the design of the plant with the help of all the documents. We especially paid attention to the substructure, the electrical design and the choice of the PV modules. Furthermore the quality of the execution was assessed within an inspection of the plant. Based on this, we prepared a final report, which included a risk assessment as well as a list of potential improvements.

Results

We found technical errors in the plant and documented them in our report. The mistakes were eliminated by the company, which was responsible for the construction of the solar system. The costs were approximately 20% of the initially project investment.

Implementation

The plant was successfully taken into operation in 2010.